Automation, Digital & Sustainability
Digital Transformation
ERP and MES implementation, IoT-enabled monitoring, cloud migration, data analytics and cybersecurity advisory for industrial and business processes.
The problem
What goes wrong without this.
Industrial digitisation fails more often than it succeeds, and it usually fails for the same reason: software is implemented on top of processes that were never defined. An ERP configured around undocumented practices encodes the existing confusion and makes it harder to change.
The second common failure is data that nobody trusts. Production figures entered manually at shift end, inventory that never reconciles to physical stock, and machine data that exists in a control system but never reaches anyone who makes decisions. Where the numbers are not trusted, the system is bypassed and parallel spreadsheets reappear.
A digital programme that works starts from a specific operating question — what is our actual cost per unit, where is capacity being lost, what stock do we truly hold — and builds only what is needed to answer it reliably.
What we do
Capabilities in this service
- Digital maturity assessment and prioritised transformation roadmap
- ERP selection, implementation, configuration and post-go-live stabilisation
- Manufacturing Execution System implementation and integration with plant floor systems
- Shop floor to top floor integration connecting PLC and SCADA data to business systems
- IoT-enabled machine monitoring, OEE measurement and production dashboards
- Business process documentation and re-engineering ahead of system implementation
- Data analytics, management reporting and decision support dashboards
- Cloud migration, infrastructure planning and hybrid architecture design
- Cybersecurity advisory covering IT and OT convergence, network segmentation and access control
- Change management, user training and adoption support through go-live
Our process
How the engagement runs
Stage-wise, with the deliverable and typical duration for each. Timelines vary with project scale and authority response — these are indicative rather than contractual.
- 1
Assessment
2–3 weeksCurrent systems, data quality, process documentation and the specific operating questions the business cannot currently answer reliably.
Deliverable: Digital maturity assessment
- 2
Process definition
3–6 weeksDocumenting and, where necessary, redesigning the core processes before any system is selected. Software implemented over undefined process encodes the problem.
Deliverable: Process documentation and target operating model
- 3
Solution selection
3–5 weeksRequirement specification, vendor evaluation and selection on fit to your actual processes, total cost of ownership and local support availability.
Deliverable: Requirement specification and vendor recommendation
- 4
Implementation
3–9 monthsConfiguration, integration with plant systems, data migration and cleansing, testing, and parallel running before cutover.
Deliverable: Configured, integrated and tested system
- 5
Go-live and adoption
4–8 weeksCutover, hypercare support, user training and the adoption follow-through that determines whether the system is used or worked around.
Deliverable: Live system with trained users
- 6
Stabilisation and optimisation
3–6 monthsPost-go-live issue resolution, report refinement and progressive extension into areas deferred from the first phase.
Deliverable: Stabilised system and optimisation backlog
Deliverables
What you receive
- Digital maturity assessment and prioritised roadmap
- Documented process definitions and target operating model
- Requirement specification and vendor evaluation report
- Configured and integrated ERP or MES
- Plant floor to business system data integration
- Management dashboards and operational reporting pack
- Cybersecurity assessment and remediation plan
- Trained users and adoption support through stabilisation
Who this is for
Typical client profiles
Why NITS Corp
Why bring this to us
Process before software
We document and fix the process first. Implementing a system over undefined practice is the most common reason industrial ERP projects disappoint.
We can reach the machines
Because we also do industrial automation, plant floor data can actually be extracted and integrated rather than re-keyed at shift end.
Vendor-independent selection
We are not resellers. Selection is on fit, total cost of ownership and local support, and we will recommend a smaller system where a larger one would not be used.
FAQ
Common questions
Which ERP do you recommend?
How long does an ERP implementation take?
Can you connect our machines to the ERP?
Do we need to move to the cloud?
Related services
Sectors we apply this in
Discuss your digital transformation requirement.
A short conversation is usually enough to tell you whether the project is viable, what it will take, and what it should cost. There is no charge for that first discussion.